Scope
What we move
Six stages. The same question at each one: where does this usually fail?
Inspected, loaded and secured before it ships. Every order.
Stage 01
Ground
| Category | Where it usually fails |
|---|---|
| Geomembrane / geotextile | The weld is the weak face, not the material. No weld test record means no weld. |
| Compaction testing | The dry density report and the sampling points don't match. Who signed it matters more than the number. |
| Dewatering | Pumps sized on dry-season conditions. Nothing holds in the wet. |
| Straw / sand barrier | Right material, wrong orientation against the prevailing wind. A year of work gone. |
Stage 02
Structure
| Category | Where it usually fails |
|---|---|
| Structural steel | Tolerances accumulate until holes don't line up on site. No trial assembly means field cutting. |
| Fasteners | Different batch, different coating, different torque coefficient. One connection, one batch. |
| Cladding / roofing | Insulation thickness fixed after the structural calculation — purlin spacing changes, and nobody priced the secondary structure. |
Stage 03
Lift & Move
| Category | Where it usually fails |
|---|---|
| Lifting accessories | Lifting points calculated on static load. No dynamic factor. A lifting point drawing is not a structural drawing. |
| Grillage / matting | Ground bearing is an assumed value, not a measured one. 50 mm of leg settlement voids the whole lift plan. |
| Heavy transport | Permits can't be compressed. Equipment can be rented. No route survey means planning for the worst case. |
Stage 04
Arid-land
| Category | Where it usually fails |
|---|---|
| Straw checkerboard | 1×1 m is the standard, but 10–20 cm buried and 10–20 cm exposed are the parameters that actually work. |
| Gravity irrigation | Enough fall doesn't mean it flows. A silted intake kills the system in a year. |
| Pivot systems | Pressure from fall or from a pump decides whether the whole power system exists. |
Stage 05
Plant and equipment
Configured, not catalogued.
A machine that suits the site is decided by access, ground bearing and transport, not by the datasheet. We specify the configuration, then source it.
Where this usually fails: datasheet selection only — no site access or ground bearing check. The machine gets stuck on arrival.
Stage 06
Mining & bulk handling
(operations, not construction)| Category | Where it usually fails |
|---|---|
| Wear parts | Right grade, wrong heat treatment. Half the wear life. |
| Conveyor components | Belt width, ply count and splice method have to agree. One mismatch and the line is rebuilt. |
| Screening media | Wrong aperture shape, throughput off spec, capacity never reached. |
| Underground haulage | Shaft dimensions cap the equipment. Check it at selection, not at delivery. |
Where this usually fails: spare parts lead time is measured in weeks, not days. Downtime costs more than the part.