Six stages. The same question at each one: where does this usually fail?

Forklift loading and positioning cargo inside a shipping container

Inspected, loaded and secured before it ships. Every order.

Stage 01

Ground

Stage 01 Ground — categories and common failure points
CategoryWhere it usually fails
Geomembrane / geotextile The weld is the weak face, not the material. No weld test record means no weld.
Compaction testing The dry density report and the sampling points don't match. Who signed it matters more than the number.
Dewatering Pumps sized on dry-season conditions. Nothing holds in the wet.
Straw / sand barrier Right material, wrong orientation against the prevailing wind. A year of work gone.
Stage 02

Structure

Stage 02 Structure — categories and common failure points
CategoryWhere it usually fails
Structural steel Tolerances accumulate until holes don't line up on site. No trial assembly means field cutting.
Fasteners Different batch, different coating, different torque coefficient. One connection, one batch.
Cladding / roofing Insulation thickness fixed after the structural calculation — purlin spacing changes, and nobody priced the secondary structure.
Stage 03

Lift & Move

Stage 03 Lift and Move — categories and common failure points
CategoryWhere it usually fails
Lifting accessories Lifting points calculated on static load. No dynamic factor. A lifting point drawing is not a structural drawing.
Grillage / matting Ground bearing is an assumed value, not a measured one. 50 mm of leg settlement voids the whole lift plan.
Heavy transport Permits can't be compressed. Equipment can be rented. No route survey means planning for the worst case.
Stage 04

Arid-land

Stage 04 Arid-land — categories and common failure points
CategoryWhere it usually fails
Straw checkerboard 1×1 m is the standard, but 10–20 cm buried and 10–20 cm exposed are the parameters that actually work.
Gravity irrigation Enough fall doesn't mean it flows. A silted intake kills the system in a year.
Pivot systems Pressure from fall or from a pump decides whether the whole power system exists.
Stage 05

Plant and equipment

Configured, not catalogued.

A machine that suits the site is decided by access, ground bearing and transport, not by the datasheet. We specify the configuration, then source it.

Where this usually fails: datasheet selection only — no site access or ground bearing check. The machine gets stuck on arrival.

Stage 06

Mining & bulk handling

(operations, not construction)
Stage 06 Mining and bulk handling — categories and common failure points
CategoryWhere it usually fails
Wear parts Right grade, wrong heat treatment. Half the wear life.
Conveyor components Belt width, ply count and splice method have to agree. One mismatch and the line is rebuilt.
Screening media Wrong aperture shape, throughput off spec, capacity never reached.
Underground haulage Shaft dimensions cap the equipment. Check it at selection, not at delivery.

Where this usually fails: spare parts lead time is measured in weeks, not days. Downtime costs more than the part.